Two out of five are replaced. Time to take a break and do the others tomorrow or Friday. Am so pleased the engineers made the access spaces so small thus allowing me to scrape up my paws as I try to fit my massive hands into such places. I did discover that I probably have 10 or 15 ratchets and hundreds of sockets as I tried to configure easy out combinations. But, it all seems to boil down to 8mm and 12 mm wrenches plus perseverance. Actually, this is the start of 3 or 4 weeks of minor fix ups on both cars.
brian from laverne
Twin w123 300d's
Posted by: bstromsoe@yahoo.com
Reply via web post | • | Reply to sender | • | Reply to group | • | Start a New Topic | • | Messages in this topic (1) |
No comments:
Post a Comment